img

Farrukhabad: When the truth test of the buses of Farrukhabad Roadways Bus Station was completed, all of the claims of the Transport Division have been uncovered. The situation of the brand new buses parked on the bus station was high quality, however the situation of the previous buses was discovered to be very dilapidated and poor. Water was dripping from many buses that left from the bus station and folks have been sitting on the seats with umbrellas open.

Your entire bus quantity UP 15 AT 8656 that left from Farrukhabad to Etawah was dripping with rainwater. As a result of this, the passengers have been sitting on their seats with umbrellas open. Ramveer, Rajesh Kumar and Mohan, who have been touring within the bus, stated that the situation of a lot of the buses is like this. In such a state of affairs, travelling with an umbrella is a compulsion.

Allow us to inform you, Uttar Pradesh State Street Transport Company had began Mission Kayakalp Abhiyan to rejuvenate the buses earlier than the rains. Below this marketing campaign, directions got to use tar on the ceiling of the buses and fully restore the physique of the buses. The buses have been additionally painted. Accountability was additionally fastened that if the bus leaks within the rain, motion will likely be taken in opposition to the accountable officers. Nonetheless, the claims of the transport division have proved to be baseless within the investigation. The ARM right here has been transferred. The brand new ARM has not but taken cost. In such a state of affairs, nobody is discovered answerable for the issue.