Etawah: The motion of heavy autos on the bridge constructed on Bhind-Etawah Freeway No. 719 Chambal River will begin from 6 am on Friday. On Thursday, the Etawah Collector has given permission to begin heavy autos from the bridge. Allow us to inform you that as a result of injury of the bridge, the motion of heavy autos on the Chambal bridge was utterly closed for this 12 months. Because of the injury to the Chambal bridge, the motion of heavy autos passing by way of the bridge was banned from June 8, 2023. However, beneath the chairmanship of the Ministry of Street Transport and Highways, Lucknow, the Chief Engineer, (Nationwide Freeway) PWD, Lucknow, Government Engineer, Nationwide Freeway Part, PWD, Etawah and MPRDC, Director of investor agency PNC participated within the on-line VC on March 14.
Within the assembly, on the premise of the investigation of IIT Kanpur and the semi-official letter of the District Justice of the Peace, Bhind (MP) dated March 29, it has been determined to begin the motion of static loadless passenger / heavy autos from the mentioned bridge. After the motion of heavy autos was banned on the Chambal bridge, the PNC firm obtained the bridge examined with the Bridge High quality and Capability Machine on 10 July 2023. After the report got here constructive, the PNC firm has spent about 4 crore rupees on the restore of the Chambal bridge. The Chambal bridge has been inspected by the crew of IIT Kanpur.